{"id":24530,"date":"2026-05-19T08:03:23","date_gmt":"2026-05-19T06:03:23","guid":{"rendered":"https:\/\/kloepfel-consulting.com\/?p=24530"},"modified":"2026-05-19T08:03:23","modified_gmt":"2026-05-19T06:03:23","slug":"terminal-expansion-port-emmerich","status":"publish","type":"post","link":"https:\/\/kloepfel-consulting.com\/en\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/","title":{"rendered":"Terminal expansion at Emmerich port completed"},"content":{"rendered":"<h2>Modernisation strengthens trimodal location<\/h2>\n<p>The most important thing first: The <strong>Modernisation of the container terminal in Emmerich Port<\/strong> reaches a crucial conclusion with the official commissioning of a new container crane on 11 May 2026. With investments running into millions, the site will become more efficient and sustainable, strengthening its role as a central trimodal hub.<\/p>\n<p><strong>Key Facts:<\/strong><\/p>\n<ul>\n<li>Central investment: New container crane replaces outdated facility; total costs for crane runway and crane approx. \u20ac12 million.<\/li>\n<li>Infrastructure upgrade: Expansion of terminal area by 12,000 m\u00b2 and modernisation of crane tracks completed.<\/li>\n<li>Financial volume: total investment of around \u20ac20 million, supported by combined transport funding.<\/li>\n<li>Future outlook: Renewal of a second container crane already planned by 2028 (funding approval secured).<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h2>Comprehensive infrastructure renewal at Emmerich Terminal<\/h2>\n<p>According to the press release, Contargo Rhein-Waal-Lippe (CRWL) officially commissioned a new container crane at the Port of Emmerich on 11 May 2026. The investment was made by the port owner, Port Emmerich \u2013 Infrastruktur- und Immobiliengesellschaft mbH. This marks the initial completion of a multi-year expansion project at the container terminal.<\/p>\n<p>According to Contargo, the facility is said to have been significantly expanded in recent years: around 12,000 square metres of additional terminal area, as well as modernised crane tracks and new handling infrastructure, were created. The aim was comprehensive modernisation and performance enhancement of the site.<\/p>\n<h3>New container crane increases efficiency and sustainability<\/h3>\n<p>The new container crane has replaced an older, technically obsolete facility. As the press release states, the new crane is intended to enable more efficient and, at the same time, more sustainable container handling.<\/p>\n<p>The investments in the crane track and container crane amount to approximately 12 million euros. A total of around 20 million euros has been allocated for the modernisation of the Emmerich port. The project was supported as part of the funding guideline for combined transport (KV), which connects waterways, rail, and road.<\/p>\n<h3>Further expansion already planned<\/h3>\n<p>Despite the completed construction phase, the development of the site is not yet finished. According to Contargo, an application for funding for the renewal of a second container crane was already submitted in 2022. Shortly before the current commissioning, there was a positive signal from the responsible funding authority regarding this.<\/p>\n<p>According to the company, the aim is to replace the second crane bridge by 2028. This will ensure and further expand the terminal's performance in the long term, thereby strengthening its important role in regional and supra-regional freight transport.<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>Press release Contargo<\/p>\n<p><a href=\"https:\/\/www.contargo.net\/de\/ueber-uns\/aktuelles\/detail\/terminalausbau-in-emmerich-abgeschlossen\/\" target=\"_blank\" rel=\"noopener\">https:\/\/www.contargo.net\/de\/ueber-uns\/aktuelles\/detail\/terminalausbau-in-emmerich-abgeschlossen\/<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Modernisierung st\u00e4rkt trimodalen Standort Das Wichtigste vorab: Die Modernisierung des Containerterminals im Hafen Emmerich erreicht mit der offiziellen Inbetriebnahme einer neuen Containerbr\u00fccke am 11. Mai 2026 einen entscheidenden Abschluss. Durch Investitionen in Millionenh\u00f6he wird der Standort leistungsf\u00e4higer, nachhaltiger und festigt seine Rolle als zentraler trimodaler Knotenpunkt. Key Facts: Zentrale Investition: Neue Containerbr\u00fccke ersetzt veraltete Anlage; [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":24531,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[88],"tags":[],"referenzkategorie":[],"class_list":["post-24530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-supply-chain-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.6 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Terminalausbau im Hafen Emmerich abgeschlossen | KLOEPFEL by EPSA<\/title>\n<meta name=\"description\" content=\"Der Terminalausbau im Hafen Emmerich ist abgeschlossen. Neue Containerbr\u00fccke verbessert die Effizienz und Nachhaltigkeit.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kloepfel-consulting.com\/en\/supply-chain-news\/terminal-expansion-port-of-emmerich-24530\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Terminalausbau im Hafen Emmerich abgeschlossen | KLOEPFEL by EPSA\" \/>\n<meta property=\"og:description\" content=\"Der Terminalausbau im Hafen Emmerich ist abgeschlossen. Neue Containerbr\u00fccke verbessert die Effizienz und Nachhaltigkeit.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kloepfel-consulting.com\/en\/supply-chain-news\/terminal-expansion-port-of-emmerich-24530\/\" \/>\n<meta property=\"og:site_name\" content=\"KLOEPFEL by EPSA\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/KloepfelGroup\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-19T06:03:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2026\/05\/terminalausbau-emmerich.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"w.demiri\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"w.demiri\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/\"},\"author\":{\"name\":\"w.demiri\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#\\\/schema\\\/person\\\/2b86e916ace0b29f82be47e779f8e0b3\"},\"headline\":\"Terminalausbau im Hafen Emmerich abgeschlossen\",\"datePublished\":\"2026-05-19T06:03:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/\"},\"wordCount\":392,\"publisher\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kloepfel-consulting.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/terminalausbau-emmerich.webp\",\"articleSection\":[\"Supply Chain News\"],\"inLanguage\":\"en-GB\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/\",\"url\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/\",\"name\":\"Terminalausbau im Hafen Emmerich abgeschlossen | KLOEPFEL by EPSA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kloepfel-consulting.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/terminalausbau-emmerich.webp\",\"datePublished\":\"2026-05-19T06:03:23+00:00\",\"description\":\"Der Terminalausbau im Hafen Emmerich ist abgeschlossen. Neue Containerbr\u00fccke verbessert die Effizienz und Nachhaltigkeit.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kloepfel-consulting.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/terminalausbau-emmerich.webp\",\"contentUrl\":\"https:\\\/\\\/kloepfel-consulting.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/terminalausbau-emmerich.webp\",\"width\":1280,\"height\":720,\"caption\":\"Terminalausbau im Hafen Emmerich\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/supply-chain-news\\\/terminalausbau-hafen-emmerich-24530\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/kloepfel-consulting.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Supply Chain News\",\"item\":\"https:\\\/\\\/kloepfel-consulting.com\\\/category\\\/supply-chain-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Terminalausbau im Hafen Emmerich abgeschlossen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#website\",\"url\":\"https:\\\/\\\/kloepfel-consulting.com\\\/\",\"name\":\"KLOEPFEL by EPSA\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#organization\"},\"alternateName\":\"KLOEPFELbyEPSA\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kloepfel-consulting.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#organization\",\"name\":\"KLOEPFEL by EPSA\",\"alternateName\":\"KLOEPFELbyEPSA\",\"url\":\"https:\\\/\\\/kloepfel-consulting.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kloepfel-consulting.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.webp\",\"contentUrl\":\"https:\\\/\\\/kloepfel-consulting.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.webp\",\"width\":616,\"height\":284,\"caption\":\"KLOEPFEL by EPSA\"},\"image\":{\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/KloepfelGroup\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/kloepfel-consulting-gmbh\",\"https:\\\/\\\/www.instagram.com\\\/kloepfel_by_epsa\\\/\"],\"description\":\"Einkaufsberatung f\u00fcr Einkauf, Logistik und Supply Chain\",\"email\":\"info@kloepfel-consulting.com\",\"telephone\":\"+4921194198433\",\"legalName\":\"Kloepfel Consulting GmbH\",\"foundingDate\":\"2007-02-01\",\"vatID\":\"DE254132249\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"51\",\"maxValue\":\"200\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/kloepfel-consulting.com\\\/#\\\/schema\\\/person\\\/2b86e916ace0b29f82be47e779f8e0b3\",\"name\":\"w.demiri\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/95f5412cbc015e3ebc4591263594846c763a4ae4b20e970c1d4edaa9fd8cc010?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/95f5412cbc015e3ebc4591263594846c763a4ae4b20e970c1d4edaa9fd8cc010?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/95f5412cbc015e3ebc4591263594846c763a4ae4b20e970c1d4edaa9fd8cc010?s=96&d=mm&r=g\",\"caption\":\"w.demiri\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Terminal expansion at Emmerich Port completed | KLOEPFEL by EPSA","description":"The terminal expansion at Emmerich Port has been completed. A new container crane improves efficiency and sustainability.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kloepfel-consulting.com\/en\/supply-chain-news\/terminal-expansion-port-of-emmerich-24530\/","og_locale":"en_GB","og_type":"article","og_title":"Terminalausbau im Hafen Emmerich abgeschlossen | KLOEPFEL by EPSA","og_description":"Der Terminalausbau im Hafen Emmerich ist abgeschlossen. Neue Containerbr\u00fccke verbessert die Effizienz und Nachhaltigkeit.","og_url":"https:\/\/kloepfel-consulting.com\/en\/supply-chain-news\/terminal-expansion-port-of-emmerich-24530\/","og_site_name":"KLOEPFEL by EPSA","article_publisher":"https:\/\/www.facebook.com\/KloepfelGroup","article_published_time":"2026-05-19T06:03:23+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2026\/05\/terminalausbau-emmerich.webp","type":"image\/webp"}],"author":"w.demiri","twitter_card":"summary_large_image","twitter_misc":{"Written by":"w.demiri","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#article","isPartOf":{"@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/"},"author":{"name":"w.demiri","@id":"https:\/\/kloepfel-consulting.com\/#\/schema\/person\/2b86e916ace0b29f82be47e779f8e0b3"},"headline":"Terminalausbau im Hafen Emmerich abgeschlossen","datePublished":"2026-05-19T06:03:23+00:00","mainEntityOfPage":{"@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/"},"wordCount":392,"publisher":{"@id":"https:\/\/kloepfel-consulting.com\/#organization"},"image":{"@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#primaryimage"},"thumbnailUrl":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2026\/05\/terminalausbau-emmerich.webp","articleSection":["Supply Chain News"],"inLanguage":"en-GB","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/kloepfel-consulting.com\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/","url":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/","name":"Terminal expansion at Emmerich Port completed | KLOEPFEL by EPSA","isPartOf":{"@id":"https:\/\/kloepfel-consulting.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#primaryimage"},"image":{"@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#primaryimage"},"thumbnailUrl":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2026\/05\/terminalausbau-emmerich.webp","datePublished":"2026-05-19T06:03:23+00:00","description":"The terminal expansion at Emmerich Port has been completed. A new container crane improves efficiency and sustainability.","breadcrumb":{"@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#primaryimage","url":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2026\/05\/terminalausbau-emmerich.webp","contentUrl":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2026\/05\/terminalausbau-emmerich.webp","width":1280,"height":720,"caption":"Terminalausbau im Hafen Emmerich"},{"@type":"BreadcrumbList","@id":"https:\/\/kloepfel-consulting.com\/supply-chain-news\/terminalausbau-hafen-emmerich-24530\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/kloepfel-consulting.com\/"},{"@type":"ListItem","position":2,"name":"Supply Chain News","item":"https:\/\/kloepfel-consulting.com\/category\/supply-chain-news\/"},{"@type":"ListItem","position":3,"name":"Terminalausbau im Hafen Emmerich abgeschlossen"}]},{"@type":"WebSite","@id":"https:\/\/kloepfel-consulting.com\/#website","url":"https:\/\/kloepfel-consulting.com\/","name":"KLOEPFEL by EPSA","description":"","publisher":{"@id":"https:\/\/kloepfel-consulting.com\/#organization"},"alternateName":"KLOEPFELbyEPSA","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kloepfel-consulting.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/kloepfel-consulting.com\/#organization","name":"KLOEPFEL by EPSA","alternateName":"KLOEPFELbyEPSA","url":"https:\/\/kloepfel-consulting.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kloepfel-consulting.com\/#\/schema\/logo\/image\/","url":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2025\/04\/logo.webp","contentUrl":"https:\/\/kloepfel-consulting.com\/wp-content\/uploads\/2025\/04\/logo.webp","width":616,"height":284,"caption":"KLOEPFEL by EPSA"},"image":{"@id":"https:\/\/kloepfel-consulting.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/KloepfelGroup","https:\/\/www.linkedin.com\/company\/kloepfel-consulting-gmbh","https:\/\/www.instagram.com\/kloepfel_by_epsa\/"],"description":"Purchasing Advice for Procurement, Logistics, and Supply Chain","email":"info@kloepfel-consulting.com","telephone":"+4921194198433","legalName":"Kloepfel Consulting GmbH","foundingDate":"2007-02-01","vatID":"DE254132249","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"51","maxValue":"200"}},{"@type":"Person","@id":"https:\/\/kloepfel-consulting.com\/#\/schema\/person\/2b86e916ace0b29f82be47e779f8e0b3","name":"w.demiri","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/95f5412cbc015e3ebc4591263594846c763a4ae4b20e970c1d4edaa9fd8cc010?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/95f5412cbc015e3ebc4591263594846c763a4ae4b20e970c1d4edaa9fd8cc010?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/95f5412cbc015e3ebc4591263594846c763a4ae4b20e970c1d4edaa9fd8cc010?s=96&d=mm&r=g","caption":"w.demiri"}}]}},"_links":{"self":[{"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/posts\/24530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/comments?post=24530"}],"version-history":[{"count":1,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/posts\/24530\/revisions"}],"predecessor-version":[{"id":24532,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/posts\/24530\/revisions\/24532"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/media\/24531"}],"wp:attachment":[{"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/media?parent=24530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/categories?post=24530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/tags?post=24530"},{"taxonomy":"referenzkategorie","embeddable":true,"href":"https:\/\/kloepfel-consulting.com\/en\/wp-json\/wp\/v2\/referenzkategorie?post=24530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}