Enter your headline here
We do not talk. We implement.
CASE STUDY

Berbel exhaust air technology

Price increase due to changes in material and labor costs

Our customer Berbel Ablufttechnik GmbH from the industrial and kitchen appliance sector was faced with significant price increases due to higher material and labor costs. At the same time, the challenge was to avoid rising procurement costs while still ensuring the highest technological and quality requirements.

The aim of the project was to establish a technologically suitable alternative supplier, reduce dependency on the previous supplier and ensure the highest quality requirements.

Alternative supplier setup with savings
720.000 €
Download the case study now.

Search

Simply type the desired search term into the field below and you will receive the matching search results live.