Enter your headline here
We don't talk. We execute.
Case Study

Berbel Ventilation Technology

Price Increase Due to Material and Wage Cost Developments

Our client Berbel Ablufttechnik GmbH, from the industrial and kitchen appliance sector, was faced with significant price increases due to rising material and labour costs. At the same time, the challenge was to avoid increasing procurement costs while still ensuring the highest technological and quality requirements.

The aim of the project was to establish a technologically suitable alternative supplier, reduce dependence on the previous supplier, and ensure the highest quality requirements.

Setting up an alternative supplier with savings
720.000 €
Now Case Study Download.

Search

Simply type the desired search term into the field below and you will receive the matching search results live.