Our client, a globally operating, medium-sized manufacturer of hotel cosmetics, was faced with the challenge of replacing expiring packaging material patents while simultaneously optimising products and costs. The previous manual process of inlay assembly by suppliers led to long cycle times and increased unit costs.
The aim was to replace the manual production step with an automated production line, enabling more efficient utilisation of staff capacity and significantly reducing cycle times.
Through our measures, a significant cost reduction of 25–30 % could be achieved.